Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on #2 Service Water Pump.…
Remove insulation from valve in 235-F Steam Station to replace valve. …
Replace well water valve WW-V-074 at 285-H.…
Building 704-20N is a double-wide trailer that was used as an administrative office for radiological control operations personnel. The building's …
782-2G Correct and replace domestic water pressure regulator valve to E-Area PCV-002.…
Removal of asbestos containing floor tiles and acoustic ceiling tiles.…
Excavate and replace Post Indicator Valve (PIV) 2021 West of Building 704-N.…
Install a new HVAC system in the L-Area Disassembly / Transfer Bay Area to provide adequate cooling for personnel comfort.…
Install two new packaged HVAC units at +34' level of L-Area Complex to provide personnel heating & cooling at +15' level to replace CHU-1 and assoc…
Excavation activities to upgrade the H-Area trailer city parking lot with addition to the parking area.…