This project will provide for Chilled Water (CHW) thermal energy storage and other efficiency upgrades at the B-Area Chiller Plant.…
This system is intended to monitor and test the inside environment of a stainless steel canister filled with 97% He and 1% O2, 1% H2, 1% N2, and at…
Replace the 285-H steam driven turbine with a like-for-like replacement.…
Vendor to replace defective rail sections noted from ultrasonic testing inspection performed in October 2019.…
The Zeiss Crossbeam 550 microscope is used to examine solid samples by electron imaging and x-ray spectroscopy.…
Remove damaged section of non-asbestos insulation and jacketing from abandoned steam line south of 285-H. Remaining insulation and jacketing will b…
Provide and install all materials and wiring necessary for the installation of a new fiber optic cable between 719-5N and the new PECMC yard office…
Remove domestic water valve H-234000-DW-V-80.088 from the domestic water system by cutting brass nipples as needed per M-DCF-H-13606. Relocate stra…
Troubleshoot and repair Heating Water Circulating Pump #005 in Building 735-1B.…
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…