CX-020017: K-Area Electronic Safeguards and Security System (E3S) Replacement & Argus Implementation
This modification will replace E3S in K-Area with the Lawrence-Livermore National Laboratory (LLNL) Argus Security System.…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Remove insulation from valve 806, so that packing can be adjusted. Valve is located in front of 736-A, SRNL.…
Replace wooden steam line support brackets with steel brackets in various locations in A-Area.…
The proposed activity (PA) is for the design/implementation of DCPs, see below, and the migration to M580 Hardware, see CMTs below, for PCMs 0-5, a…
At the Scrap Lumber Pile 631-2G a DPT rig will collect soil samples to a depth of 10-ft at 19 locations. At the Ford Building (690-N) 27 hand aug…
In 108-1L, remove existing instrument air piping valves V-563, V-564, and V-565. Fabricate, hydro test, in-service leak test & install new spool p…
Reroute Domestic Water underground piping around Trailers 704-62S and 704-63S.…
Transport, Receipt, and Unloading of Samples from VC Summer. Rev. 2 Added returning samples to glass vials, where the vials will be subsampled usi…
The proposed action is to fully remove the existing roof system on building 292-F, Fan House, down to the existing metal deck and replace it. …