Install compressed gas cylinder bottle rack outside of K-Disassembly Basin, 105-K…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
Replace the tile and carpet in the 105-K Personnel Wing Ladies Restroom and Locker Room.…
Paint Rooms 243, 244, 334, 336, and 337. Replace carpet in Room 243. Activities will occur in Building 730-B.…
Work will include replacing some ceiling tiles, fixing holes in walls, painting walls and doors, and fixing/repairing the cove base. No asbestos c…
Replace all exterior light fixtures on 233-23H and 233-24H with LEDs.…
This activity is ongoing and involves the operation and maintenance of an Ion Chromatography (IC) system(s) in 773-A B-134 containment units CHEX h…
This Laboratory Directed Research & Development (LDRD) is designed to evaluate the viability of a self-propagating synthesis method to stabilize an…
Fourier Transform Infrared (FTIR) uses a beam of infrared light to analyze a sample in a non-destructive manner. The samples are returned to custo…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containing mater…