This EEC is for the placement and implementation of the N-Area Temporary Asbestos Storage Containment Area. This will involve receipt, storage, an…
The Check Station Building at Crackerneck Wildlife Management Area and Ecological Reserve (CWMA&ER) is an open structure that provides South Caroli…
Deactivation of 690-N Ford Building and Ancillary Structures / Equipment in preparation for Decommissioning (Demolition) of the facility.…
The Thomas Jefferson National Accelerator Facility (TJNAF or Jefferson Lab (J-Lab)) used a tritium filled vessel in a fundamental physics experimen…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is required. These excavati…
Replace Temperature Valve in AHU #5 & #6 with insulation/gasket removal and replacement as necessary.…
Building 233-H P-Evac Hydride Bed Replacement…
Upgrade lighting to LED as current bulbs expire.…
Construction will remove and replace the bent gutter on North Side of Low Activity Waste Vault (LAWV).…
Vendor to clean Nurse Tanker SRO# 0148.…