The U.S. Department of Energy National Nuclear Security Administration Office of Material Management and Minimization, proposes to provide financia…
The U.S. Department of Energy National Nuclear Security Administration Office of Material Management and Minimization, proposes to provide financia…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Construction will remove asbestos insulation and replace with non-asbestos insulation.…
A treatability study will be performed to inject natural artesian groundwater from two nearby production wells in D-Area into the upper water table…
Perform cleaning, seal coating, and restriping of parking lots in C-Area (613-C, 613-1C, 613-2C). …
Install Wacker Neuson Model G-25 (Serial# 24367879) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR00595) at 901-Z, Ronnie Scott's Hut…
Subcontractor will provide roof repairs on Building 618-G. The Subcontractor will not disturb the existing roof while performing these repairs on B…
Proposed activity is to dig 12 inches deep by approximately 12 inches in length and width beside the 285-H basin wall at the construction joint tha…
The River Water Pumphouse, 681-3G, utilizes an outdoor 8-ton gantry crane with local and remote pendent controls. The control panel was last replac…