This work scope is to set-up and operate a newly procured rope saw on the test wall at 666-E prior to utilizing in various areas across the site. T…
241-280H Replace Manway on Tanks 01 & 02 and remove existing gaskets.…
This activity is to evaluate and correct lighting fixtures throughout Building 706-4F.…
Remove all coatings down to the original concrete floor in Room 16 of Bldg. 705-N.…
Removal of the 10-inch abandoned steam line, containing non-asbestos insulation per SDD-APG-2016-01366 asbestos inspection document. Steam pole rem…
A 9975 container is being heated to a temperature of up to 250F with external and internal heaters.…
C. E. Bourne Subcontractor 00000611 will provide assembly and disassembly roof repairs at Building 105-L.…
Repaint and black out sections of parking lot.…
Overhaul the diesel driven fire water pump at Building 901-Z due to normal wear and tear. Gaskets and packing material to be handled as potential a…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. The approximate width of the riprap addition i…