Plutonium metal will be brought into SRNL for packaging in a long term configuration. Rev. 1 added Labs B135/139 to activity location.…
607-70G Remove insulation from process water line in Ditch 1.…
Remove, replace, reinstall MST-TRP-001 (steam trap) associated piping, insulation (non-asbestos), and potentially asbestos containing material (PAC…
This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…
This proposed activity will regasket a drop jumper in the Canyon Building. The gasket is assumed to be asbestos containing material.…
The partial closure of the F-Area Inactive Process Sewer Line (FIPSL) Treblers (904-108G and 904-47G).…
Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…
A Storm Water Visual Assessment Sample Holder (a.k.a Kremlin sleeve) is to be installed at outfall S-10A. …
Remove existing temporary scaffold-style handrail and replace with a permanent handrail.…