Award Number: DE-EE0008827, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): SC, Office(s): Golden Field Office
Install conduit, wiring, and receptacles for Exit and Emergency lights in Building 789-B.…
Replace carpet in Building 703-A.…
Install an Electric Discharge Machine (EDM) in building 234-H that requires a chilled water unit, electrical supply, instrument air supply, de-ioni…
Create an asphalt floor and entry/exit to quonset hut in the gravel lot north of the KAC main parking lot.…
Perform repairs to the interior of Building 705-N.…
L-Basin High Flux Isotope Reactor (HFIR) Fuel Resin Cleaning Stations…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
Install electrical power and sample tubing for SRNL Monitoring Trailer.…
B-6 RCL Waste Container Material Inspection / Retrieval per procedure 233-52196.…