Treatability Study in D-area to support D-Area Groundwater Remediation…
This proposed activity will remove roofing on top of H Canyon and install a water-proofing system.…
Four monitoring wells near the perimeter of the Mixed Waste Management Facility need the current deployed submersible pumps replaced with low flow …
CX-021052: Remove Two PACM Gaskets from F Base Injection Flow Indicator Transmitter (flange) FIT-170
Remove two Presumed Asbestos Containing Material (PACM) gaskets from Flow Indicator Transmitter (CIS-FIT-170) at F Base Injection.…
Subcontractor will provide roof repairs at Building 706-3F. The Subcontractor will not disturb the existing roof while performing these repairs on…
Repair PACM inuslations in Building 772-F, Room 108.…
Subcontractor will provide roof repairs at Building 226-2F. The Subcontractor will not disturb the existing roof while performing these repairs on…
Construction of Prefabricated metal building, potable water line, and septic/drain field, and installation of two evaporators.…
The recloser on A01 feeder is reaching end of it's life cycle and should be replaced.…
Subcontractor will provide roof repairs at Building 225-5H. The Subcontractor will not disturb the existing roof while performing these repairs on …