Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
This activity will encompass two (2) analytical methods that will be performed in 773-A, B-111: Interfacial Tension (IFT) and Oil and Grease Analys…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
At the Aviation Operations Department, a fuel drip has developed. An absorbent pig is located within the fuel pit and is absorbing the drip. The dr…
Repair SW Valve No. 10 at 681-3G.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
EEC covers the Real Estate Lease, siting, construction, utility installation and operation of the Verizon-SRS ll Cell Tower and appurtenances adjac…
Renovate Lab C-130 in Building 773-A to provide a modern laboratory space with a large radiohood located in the center of the room.…
This EEC covers the installation and operation of an autoclave, Model SSR-3A-ADVPB in Building 607-17A.…
Two plastic 3D printers will be operated inside 723-15A.…