Replace Discharge Pump #1 at the 607-1M lift station due to failure.…
Removal of two 1/2"-asbestos gaskets from an Inlet Sample Valve on the Purge Water Tank # 1 in M-Area (M-782002) and replace with asbestos gaskets.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is not required. These exca…
Adding additional grab ports to the MS3 grab sample manifold.…
This scope of work is to remove any existing material from the three specified expansion joints—one of which lacks any sealant and is cracking—and …
Temporary modification, 233H-TMC-18-256, is initiated to replace the currently installed water trap # 2 level probe (H-233000-STRP-LE-ZR.290L), loc…
The Uninterupted Power Supply (UPS) located in the Purification Area of the K-Area Complex, which services various components of the safeguards and…
A High Performance Liquid Chromatography (HPLC) system is used by Analytical Development for organic sample analysis. Sample aliquots injected into…
Preparation of reagents and non-radioactive quality control standards in support of Analytical Laboratories.…
This R&D project will be examining separation of various uranium salts from environmental samples. The separation will employ solvent extraction us…