This activity involves transferring an old office trailer to the SRSCRO and replacing it with a new trailer.…
The proposed action is for the closure of two underground storage tanks.…
Preparation work on TRU Pad 4 for installation of Non-Destructive Assay (NDA), Non-Destructive Evaluation (NDE), and Flammable Gas Analysis (FGA) e…
The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the…
Remove receptacles and non-load bearing wall between Rooms10 &11 in Building 773-63A.…
Install new ATM Saphir 550 polisher/grinder assemblies and laboratory sink in 234-7H and D&R existing Buehler polisher/grinder assemblies. Replace…
Overhaul pump EFP #1 at 902-5B.…
Remove and reinstall insulation from Service Water (SW) Pump 003 so that check valve can be replaced.…
Painting interior of 701-1L…
Replace failed flow transmitter for RWM-02 Recovering Well located in A/M Areas. …