Installation of D-Area groundwater monitoring wells for data collection. …
The main objective of this project is to design, develop, additively manufacture, test, and validate three types (temperature, pressure, and blade …
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on relief valve PSV-012 (Pressure Safety Valve).…
Install sidewalk and replace damaged stairs at Building 226-2F.…
Remove 252-9H Substation northwest of Building 232-H in the Tritium facility. …
Remove Research Reactor Fuel Counter II (RRFC II) and associated equipment from 105-L Disassembly Basin.…
Project Y-757 replaces E3S with the Argus Security System for components not already identified by Projects Y-738, Y-732 and Y-724 in the Tritium F…
Disconnect and remove electrical cables and fuses from 125V Distribution System in 108-2L.…
Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal rather than d…