Repairs are needed for a damaged wall in room 1056 at 766-H.…
The scope of this activity covers the initial assembly, test setup and operation of the helium (He) leak detection equipment and instrumentation fo…
The motor and pump for domestic water deep well 905-113G need to be replaced/rebuilt due to degradation from continuous operation.…
Corrective maintenance activity is required on the 607-46G lift station in order for it to work properly.…
This activity will modify the chemical feed system and associated concrete containment structures at the 789-B domestic water treatment plant. Rev…
Replace the outboard bearing packing on Pump 004 at 681-3G Pump House.…
Subcontractor will provide roof replacement at Building 251-F. The Subcontractor “will ” disturb the existing roof while performing this replacemen…
Subcontractor will provide roof replacement at Building 717-K. The Subcontractor will disturb the existing roof while performing this replacement o…
The goal of the catalyst research is to create innovative materials and intellectual property. This project seeks to develop a high performance cat…
Due to a concern over the occurrence of potential biological material in the SRS Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) Strip Fe…