Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …
This activity is for completing deactivation of the 236-H By-Product Facility. This facility includes the retired Burst Test Process, the He-3 Puri…
Installation of new domestic water piping in J and S-Areas.…
Since during operation of the 105-K KIS Vault uses compressed gas nitrogen and carbon dioxide as part of the process, potential gas leakage and asp…
Replace the existing metal halide and fluorescent lights in the K- Area 105-K building with LED Technology.…
This is a treatability study to mitigate glycolate in real DWPF sample liquid material with added Slurry Mix Evaporator (SME) slurry. …
Insulation and mastic to be removed from chilled water piping feeding AHU-002 at 702-2A. Section to be removed to allow access to a y-strainer for …
Tile removal and replacement in 105-K Personnel Wing, Room 1013.…