The proposed activity is to allow discharge of non-process HVAC chill water to the stormwater ditch that goes to the constructed treatment wetland …
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals. …
The Cyberex Inc Rectifier-Charger Model 130/106R3 is being replaced with the Hindle Power Station Float Battery Charger in Building 108-2K.…
719-N Prep and Paint 8 Concrete Bollards for High Visibility …
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Pull sediment samples from settler tank for characterization and ultimate disposition.…
Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for release of c…
Award Number: DE-EE0008730, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): SC, Office(s): Golden Field Office
Proposed activity covers those actions associated with cleaning and maintenance of lasers and associated optics owned by AD at SRNL (A Area).…
The Sikaflex sealer in the joints at the Heavy Water Component Test Reactor (HWCTR) have degraded. The existing material will be removed via wire w…