Remove, replace, reinstall MST-TRP-001 (steam trap) associated piping, insulation (non-asbestos), and potentially asbestos containing material (PAC…
Upgrade 254-5H Diesel Fuel Level/Leak Detection System with a Veeder Root Level/Leak Detection System.…
607-70G Remove insulation from process water line in Ditch 1.…
This proposed activity will regasket a drop jumper in the Canyon Building. The gasket is assumed to be asbestos containing material.…
This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…
The partial closure of the F-Area Inactive Process Sewer Line (FIPSL) Treblers (904-108G and 904-47G).…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Remove existing temporary scaffold-style handrail and replace with a permanent handrail.…
The proposed activity (PA) is for the design/implementation of DCPs, see below, and the migration to M580 Hardware, see CMTs below, for PCMs 0-5, a…
At the Scrap Lumber Pile 631-2G a DPT rig will collect soil samples to a depth of 10-ft at 19 locations. At the Ford Building (690-N) 27 hand aug…