Savannah River Tritium Enterprise and Savannah River National Laboratory have implemented Digital Imaging and Measurement System, which uses digita…
The Subcontractor will re-attach all loose metal and replace screws with oversized screws. Repair entire perimeter, front and back with hydro-stop …
The Subcontractor will install new sheet metal flashing between roof eave and the awning, install new foam closure in the same location as the shee…
The Analytical Development group will use the Agilent Inductively Coupled Plasma Emission Spectrometer to perform elemental analysis on liquid samp…
The domestic water line in near Building 760-G has developed a leak and needs to be repaired. This is due to old age and wear and tear of the under…
This activity involves the development of radiation resistant high density foam in support of improved decontamination and decommissioning operatio…
Structures to be located on the 232-1H Concrete Pad at Savannah River Site.…
CHEX-HOOD-68 is being removed and a blank is being installed above the ceiling tiles.…
Excavate, cut, and cap fire water line between Trailer 707-35B and PIV-2037 (Post Indicator Valve). …
Repair or replace fuel nozzle at 703-6B Heliopad. Handle is not working properly when squeezed. The pump is used to fuel Centerra helicopters.…