Subcontractor will provide roof repairs at Building 717-N. The Subcontractor will disturb the existing roof while performing these repairs on Build…
Install a new HVAC system in the L-Area Disassembly / Transfer Bay Area to provide adequate cooling for personnel comfort.…
902-3H Replace packing in valve H2-902-3-FP-V-022.…
Subcontractor will provide roof repairs at Building 773-A, F-wing.…
The Advanced Reactive System Screening Tool (ARSST), manufactured by Fauske
Replace bearings for on chilled water pump at 235-2F. The presumed asbestos containing material (PACM) gasket material at the flanges will be remov…
Replace the Bartex level instrumentaiton for HB-Line Tank NT-31 with radar level instrumentation. Revision is being submitted to provide new dates…
Excavate to obtain a soil sample from underneath the catch bucket at 715-2G Fueling Station, so the analytical results can be made available to Sou…
Remove one Presumed Asbestos Containing Material (PACM) gasket from ABRP well AHT-14. Removal of gasket will allow for maintenance to repair broke…
A new metal-organic framework (MOF) will be tested for removing pertechnetate from a sample of SRS high level waste.…