Remove presumed asbestos containing material gaskets and replace PSV-002 on Soda Ash Pump 002 in Building 789-B.…
Repair floors in Trailers 704-37E and 704-29E, including removal and replacement of floor and cove base.…
Valve H2-241125-FP-V-053 (Fire Protection Valve) will be replaced with a like-for-like valve. Valve is leaking. Remove and dispose of asbestos gask…
Remove all coatings down to the original concrete floor in Room 16 of Building 705-N.…
Remove soil saturated with diesel fuel at Building 703-A, C-Wing.…
The north medium bay roll-up door on Building 717-F no longer functions. The north medium bay roll-up door will be replaced, including the door, do…
The Subcontractor will caulk 30 feet at parapet/expansion joint to stop leaks at Building 284-20H. The Subcontractor will disturb the existing roof…
The Subcontractor will install one (1) 3" drain insert, flash dry drain insert in with one (1) 4' X 4' modified patch, and seal perimeter of patch…
Clean/vacuum precipitator hopper and extension auger. Wood ash will be delivered to Three Rivers Landfill under a special waste manifest. Rinse wa…
The men’s rest room has flooded and caused floor damage in Bathroom Trailer 704-73E requiring floor replacement for entire trailer. Construction wi…