Replace 16 1000W HID lighting fixtures in 717-F Jumper Shop bay with a comparable LED type, Lithonia Model number JHBL 45000LM ACL WDMVOLT GZ10 40K…
Repair chill water leak in Air Handling Unit number 4.…
Replace carpet, floor covering, and cove base in Building 707-F.…
SRNL will use an organic carrier to introduce a metallic or ceramic compound to the internal surface of a pinch weld and then conduct pinch weldtri…
Subcontractor will provide roof repairs at Building 716-4A.…
Pending the completion of renovation activities in 773-A, B-147 and 151 Analytical Development Section (ADS) will install and operate an Agilent770…
773-A, B135 and 139 is a multi-purpose laboratory equipped with instrumentation to process and or analyze liquid, solid, and gaseous samplesutilizi…
This EEC is written to cover solvent qualifications associated with the Salt Waste Processing Facility, SWPF.…
The proposed activity is to replace the roofing systems over 773-A, E-004, 008, 131 and conduct warranty repairs as needed.…
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self contained lowpower…