Remove and reinstall insulation from Service Water (SW) Pump 003 so that check valve can be replaced.…
Main Feeder Utility Pole Treatment requiring soil disturbances within the B, D, L, K, and General Technical Areas. …
Painting interior of 701-1L…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Replace failed flow transmitter for RWM-02 Recovering Well located in A/M Areas. …
The obsolete discrete HVAC controllers in HB Line will be replaced with DCS control.…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…
Replacement of tile, carpet and sheet rock due to water damage / mold growth from water leak in heater room in 704-C…
This proposed activity will remove wallpaper, paint walls, and remove carpet from Building 703-H.…