Subcontractor will provide roof repairs to Building 717-2B. The Subcontractor will not disturb the existing roof while performing these repairs on …
This activity installs a new vendor-designed, skid-mounted chemical feed system adjacent to the north side of the 285-11H Cooling Tower return flum…
Remove pressure relief valve H-284000-DW-PSV-001 on water heater located inside Building 284-H. Water heater is to be abandoned in place.…
Legacy insulation needs to be removed from Rm 602 in HB-Line. The insulation will be handled as asbestos.…
HB-Line will be entering Lay-Up status. The Process Air (PRA) system for HB-Line will not be needed to support the facility while in this configura…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…
Remove Pipe Insulation from Battery Room 100 in Building 772-7B.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…
Analysis of water samples using liquid scintillation spectrometry.…