Construction personnel will remove asbestos insulation in the Hot Gang Valve Corridor and replace with non-asbestos insulation.…
The scope of this work is the extraction of deuterium oxide and singly-deuterated water from water and deuterium oxide mixtures using combinationso…
Install Universal Wiring, UW, in Building 703-47A.…
Construction personnel will seal asbestos insulation on the duct located in the closet of Room 125 - Building 704-H.…
Inspection and treatment of wood 13.8kva Feeder power poles in L-Area.…
Remove building 707-11F and dispose in C&D Landfill.…
Install Universal Wiring, UW, in Building 730-1B.…
Overhaul of Shone Ejector number 2 located at 607-2A.…
The Forest Service will prepare a design for and complete necessary repairs to the approach to Bridge No. 603-41G.…
The ICW Booster Pump and motor need to be replaced due to age.…