Subcontractor will provide roof repairs at 770-A with addition of Hydro-Stop coating.…
704-S Rooms 78, 80, 82, 83, 83A, 83B, and 85 will be remodeled to function as stand alone offices with work to include framing, drywall repair and …
730-4B Touch up paint and replace cove base for Rooms 135A, 135B, and 134.…
703-43A Remove/replace carpet.…
MOX-Termination has determined that portable building 149 is now excess.…
This scope of work covers activities associated with the development of electrolytic cell and catalyst reactor components for projects such as sulf…
Verizon Wireless is upgrading the existing Mobile Access Distributed Antennae System (DAS) and multiple repeater sites located on the SRS facility …
Subcontractor to perform roof repairs for Building 794-A.…
Subcontractor will provide roof replacement at 735-A.…
The SRS Liquid Waste contractor sends routine characterization samples from the H-area and F-area Tank Farms to the Savannah River National Laborat…