It has been identified as containing asbestos, and it needs to be removed and replaced.…
Subcontractor will provide roof repairs at 225-7H .…
Remove the undercoating and replace with galvanized carbon steel sheets.…
The Bettersize S3 Plus Particle Image and Size Analyzer will be installed in 999-2W lab 154 in order to provide particle size and shape analysis fo…
Contract Management Inc. will provide sidewalk repairs at 737-A, SREL.…
Subcontractor will provide roof repairs at 623-30G.…
Remove and replace steam relief valves located at the steam station area at 235-F.…
Cover hole in wall with metal plate in corridor 1001 in 235-F.…
Subcontractor will provide roof repairs at 751-1A.…
Subcontractor will provide roof replacement at 681-17N.…