Replacement of Area Velocity Flow Sensor at Stream Surveillance Location FM-A7…
A new domestic water well will be installed for the Barnwell Barricade.…
Replace carpet in IT Area in 730-4B 1st Floor.…
SRNL will determine the moisture retention properties of various formulations of cementitious materials that are representative of SRS and offistew…
Air gapping of mechanical lines to isolate building 236-H.…
The activity consists of flowing Ar or N2 through a packed bed of porous zero valent iron (p-ZVI) to measure the pressure drop across the bed.…
Replace steps and decking at 235-11F.…
Push 3 CPTs down to lower part of Lower Aquifer Zone (LAZ) for lithology.…
Install WI-FI in 730-2B Room 204.…
Remove and replace drywall in areas affected by the flooded floors in Buildings 730-1B, 730-2B, 730-4B, and 703-1B.…