Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.…
Measurement of hydrogen generation from SRS Tank Farm actual-waste samples at a series of temperatures with and without addition of glycolate.…
Fabrication of scientific glassware and apparatus for SRNL and SRS as needed. …
Crush and run will be applied to level the access path to Sampling Point PB-3 off of Highway 125.…
Subcontractor will provide roof repairs at 617-11G. The Subcontractor will disturb the existing roof while performing these repairs on 617-11G. The…
This EEC is for the placement and implementation of the N-Area Temporary Asbestos Storage Containment Area. This will involve receipt, storage, an…
Valve and presumed asbestos containing material (PACM) gasket removal and replacement at H Base Injection.…
The Savannah River Site Community Reuse Organization (SRSCRO) shall furnish labor, material, equipment, tools, PPE, and supplies necessary to perfo…
The Check Station Building at Crackerneck Wildlife Management Area and Ecological Reserve (CWMA&ER) is an open structure that provides South Caroli…
Deactivation of 690-N Ford Building and Ancillary Structures / Equipment in preparation for Decommissioning (Demolition) of the facility.…