Using 3D printer to Develop Parts for Unmanned Aerial Vehicles.…
Remove Restroom Trailer 245-10F to the SRS Community Reuse Organization (CRO) laydown yard for future disposition.…
Construction will perform light pressure wash and paint exterior of trailers (no scraping) on 704-49E, 704-50E, 704-51E, and 704-66E.…
Replace Fire Alarm System in Building 703-47A.…
Remove out-of-service steam line section near 717-A.…
Replace existing General Services (GS) hydrogen supply isolation valves with new Safety Significant (SS) valves.…
The purpose of this activity is to modify/improve mechanical properties for a thermosetting polymer extrusion process.…
Testing will be performed in the 773-A E-wing Shielded Cells to assess the impact of increased fissile loading in glass on glass durability.…
Electrical load consolidation from Motor Control Center (MCC) MCC-32M1 to MCC-38M1.…
Mount a utility pole and associated parts at the 730-1B Rally Point in order for a Solar Powered Wireless PA to be installed.…