Remove west filter hold-down beam from 55 Elevation of the 105-L Building.…
A pre-built 12’ x 32’ storage building with be set up northwest of 782-4G in the Burma Road area. The purpose of the building is to store EC&ACP chem
The scope of this modification is to modify Building 773-42A to provide a new security boundary.…
Repair water damage in Building 705-N, Room 6.…
Remove and replace 931 condensate tank Pump A in -40 of 105-L.…
Seal K-Area sealand/seatrain roof with Blue Max sealant to prevent leakage.…
Existing high pressure sodium light fixtures in 233-H attic will be replaced with LED fixtures.…
Install a Shoreline Power drop in Building 709-7G for the reserve fire truck.…
Replace the ultra-violet disinfectant system at the effluent of the Central Sanitary Waste Treatment Facility (607-74G). …
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…