This study aims to evaluate the mercury (Hg) and hydrogen gettering and retention abilities of metal catalyzed inorganic substrates, in support of …
This activity will investigate the effects of various processing conditions (heat, hydrogen, air) on vacuum oils.…
Due to a high demand of portable power in H-Tank Farm, 11 Diesel Generators, 2 Diesel Compressors, and 1 Diesel Light Tower have recently been proc…
Install flow measurement equipment in the existing twin culverts under E Road at the F-08 Outfall.…
Sphincter seal assemblies have been proposed for introducing blend cans and shield cans into gloveboxes for use in the downblending process of surp…
A decision was made to permanently cease operation of the TRS.…
Install a new Uninterruptible Power Supply (UPS) system that will replace the existing 50 kVA UPS in Building 702-A, Room 113…
Pressure wash and repaint safety striping around 784-7A Steam Plant.…
Inspection and Treatment of Utility Poles requiring soil disturbance within the F, N, and General Areas…
Replace Uninterruptible Power Supply (UPS), which will consist of the installation of two (2) new UPS systems, in Building 703-44A.…