D and R of K-Area Purification Steam Supply Line…
The activity will allow for introduction of air into the sample loop to "clean up" and evacuate tritium holdup.…
Repaint grey and yellow areas at the 772-F Sample Tunnel Lift.…
Handi-House, SRS-PB-00514, is to be demolished due the structure collapsing.…
Renovate exterior of wall of Room 332 in Building 730-4B to include wallpaper removal, painting, and vinyl lettering.…
Activities to support Tank Farm and DWPF with qualification of Sludge Batch 10.…
Remove existing guardrails and ladder on 234-H. Install an aluminum ladder that meets OSHA and NFPA 101 requirements.…
Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Subcontractor will provide roof repairs at Building 703-10B.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…