Troubleshoot and repair Heating Water Circulating Pump #006 in Building 735-1B.…
Wash/clean, caulk, and repaint Trailer 704-74F.…
A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Pre…
Painting the exterior of Building 701-1L.…
Replace Valve SCW-V-4501 at K-Area Assembly Area and associated insulation.…
Removal of presumed asbestos containing material (PACM) gaskets to replace plastic relief valve (PSV 002) for Phosphate pump 002 located inside 789…
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
A subcontractor will design and construct a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contami…
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F. Ve…
Repair deck and stairs at Trailer 254-12F.…