Replace the packing in Return Pump #3 at 281-2H.…
Building 616-G has reached an end state and will be demolished.…
Subcontractor will provide roof repairs at 704-16B.…
Augusta Industrial to pressure wash internal cooling tower basins at 785-1B and 785-A.…
Install backboards in phone room in 722-A.…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
Upgrade 254-5H Diesel Fuel Level and Leak Detection System with a Pneumercator Level and Leak Detection System.…
Soil Neutralization Amendments for the D-Area Coal Storage Area…
Relocating steam heater and associated electrical and piping per DCF.…
Evaluate and repair crane solenoid and breaker that is intermittenly tripping on low lift crane at 681-3G.…