Install an automatic transfer switch (ATS) to provide two different sources of electrical power to lighting panel PNL PP1 in Building 703-44A.…
Run new conduit and conductors from disconnect.…
233-H Tritium Air Monitoring Sample Point valve K-51 M-R1 will be removed and blank pipe flange installed.…
This activity involves the removal of a bead blaster machine from 716-N.…
The HANM Classified D/3 DCS 16000 I/O modules in PCM-13 that interface with field instruments and controls have exceeded end of life.…
The objective of this project is to determine vegetation's physiological response to metal exposure and other chemical and physical stressors.…
Project Y802 supports SRNL R and D Engineering in installing a new mass spectrometer room in Building 723-A per MT-SRT-2020-00004.…
This EEC covers the operation of the AccuTOF-DART time-of-flight mass spectrometer…
Install new handi-house (663-62G) to replace 663-34G, which will be relocated offsite by the SRS Community Reuse Organization (SRSCRO).…
A benchtop designed commercial heating and cooling chamber with the capability of achieving temperatures ranging from -100 C to 150 C.…