This design change (M-DCF-K-00585) will replace the 216-B sump pump and the associated discharge piping. Due to the existing anchor bolts in the su…
Remove remaining floor tile from RBOF (Receiving Basin for Off-site Fuel) facility. Scope of work includes removing floor tiles, removing tile mast…
Installation of 6 New Trailers with Utilities and including sidewalks at 742-G Trailer Complex Area. …
The proposed activity is to allow discharge of non-process HVAC chill water to the stormwater ditch that goes to the constructed treatment wetland …
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals. …
719-N Prep and Paint 8 Concrete Bollards for High Visibility …
Pull sediment samples from settler tank for characterization and ultimate disposition.…
The Cyberex Inc Rectifier-Charger Model 130/106R3 is being replaced with the Hindle Power Station Float Battery Charger in Building 108-2K.…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for release of c…