Project Y-757 replaces E3S with the Argus Security System for components not already identified by Projects Y-738, Y-732 and Y-724 in the Tritium F…
Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal rather than d…
This is a treatability study to mitigate glycolate in real DWPF sample liquid material with added Slurry Mix Evaporator (SME) slurry. …
Tile removal and replacement in 105-K Personnel Wing, Room 1013.…
Since during operation of the 105-K KIS Vault uses compressed gas nitrogen and carbon dioxide as part of the process, potential gas leakage and asp…
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …
Replace the existing metal halide and fluorescent lights in the K- Area 105-K building with LED Technology.…