The proposed activity will perform asbestos abatement work in the H Canyon Hot Gang Valve Corridor (HGVC).…
Perform excavation activities and install additional cathodic protection around the fuel tank to support testing at 715-F Fuel Station.…
Modify Module Stripper GB3000 in Room 120 of Bldg 264-H to provide removable panels in the glovebox shell to enhance maintenance of the blowers wit…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
Establish food plots on Dominion Energy right-of-ways near high deer impact roadways to harvest deer and hogs to reduce animal / vehicle collisions…
The Purge Water Disposal Station (PWDS) discharge piping has become clogged with suspected well development fluids suspected of containing portland…
Repair Entry Door #206 and 207 at 292-2F Fan Room.…
Replace Valve F1-905102-WW-V-016 at 905-102F Process Deepwell.…
Replace 218-2H Cooling Water Chemical Injection System. The existing chemical addition system for the 218-2H Cooling Water System is not providing…
This proposed activity entails having a roofing contractor perform concrete core drilling on the roof of H Canyon.…