Mount a utility pole and associated parts at the 730-1B Rally Point in order for a Solar Powered Wireless PA to be installed.…
This activity is needed for the placement of two (2) 44' x 52' concrete pads and three (3) sealands (263-289H, 263-290H, and 263-291H).…
Subcontractor will provide roof repairs at 225-6H. The Subcontractor “will not” disturb the existing roof while performing these repairs on 225-6H.…
Subcontractor shall remove propane from the Lead Melter Propane Tank at 711-4N and the 716-4N PECMC Propane Tank so Construction may replace the fa…
Renovations to 725-N, Room 1 flooring in Central Shops.…
Prepare nonradioactive salt simulant solutions that are representative of waste streams from SRS and offsite for testing.…
Support of MCU operations will require the preparation and use of a combustible solvent mixture.…
A bead blaster located inside 717-F will be removed and excessed.…
The current 234-H Main Side HVAC equipment was installed in the mid 1950's.…
Analytical Laboratories to move the pyrohydrolysis and hot block capabilities from F/H Lab to Lab C-154/158 in Building 773-A.…