Install metal/cork strips around Room 76 in Building 707-F.…
McQuay Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for relea…
Evaluate and repair crane solenoid and breaker that is intermittently tripping on low lift crane at 681-3G.…
Installation of D-Area groundwater monitoring wells for data collection. …
The main objective of this project is to design, develop, additively manufacture, test, and validate three types (temperature, pressure, and blade …
Install sidewalk and replace damaged stairs at Building 226-2F.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on relief valve PSV-012 (Pressure Safety Valve).…
Remove 252-9H Substation northwest of Building 232-H in the Tritium facility. …
Disconnect and remove electrical cables and fuses from 125V Distribution System in 108-2L.…
Remove Research Reactor Fuel Counter II (RRFC II) and associated equipment from 105-L Disassembly Basin.…