Subcontractor will provide roof repairs at 705-H.…
Subcontractor will provide roof repairs at 249-H.…
Piping will need to be removed and worked to fit the new filter. Some piping components will be replaced.…
The attached Scope of Work provides details for the replacement of PIV 2070, which will be replaced with PIV 2230.…
722-N, Remove carpet/tile and cove base due to water intrusion.…
The PA is to remove a thermally actuated valve that is currently integrated into the fire suppression system (FSS).…
Temporary Modifications (Temp Mod) 264H-TMC-19-270 and 264H-TMC-19-271 utilize tubing, regulator, PSV, and associated fittings to provide a bypass …
Seven (7) data lines will be installed in room 422 of 105-L.…
Apply roof coatings and seal roof leaks.…
A portable building will be installed in 737-A SREL Complex for research purposes.…