The proposed activity is to remove the Real Time Radiography (RTR) characterization equipment on TRU Pad 4, which includes the removal of its elect…
A new exhaust line will be installed to connect CHEX-HOOD-136 to a vacuum pump that maintains a vacuum on R&D equipment per WO 01806900.…
Laboratory 141 and 193 of the 999-2W facility will be used to perform general chemical and nanomaterials research support for NHS, HPG, EM projects…
Selected vendor will recycle scrap metal from SRS.…
Construction will perform light pressure wash and paint exterior of trailers (no scraping) on 704-49E, 704-50E, 704-51E, and 704-66E.…
754-5A Install vent pipe on top of diesel generator building.…
Remove and Replace Two Wooden Pedestrian Bridges to the South of Building 706-2F.…
714-2N Replace carpet/prep and paint in room No.'s 4 and 7.…
Inspection and treatment of utility and power poles in the F-Area.…
Due to a demand for portable power in F-Tank Farm, 2 Diesel Generators have recently been processed for eligibility in our Reciprocating Internal C…