C. E. Bourne Subcontractor 00000611 will provide assembly and disassembly roof repairs at Building 105-L.…
Repaint and black out sections of parking lot.…
Perform repairs to Building 719-5N.…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. The approximate width of the riprap addition i…
772-F domestic water outlet isolation valve is leaking. In order to repair domestic water line near regulator, the presumed asbestos containing mat…
Replacement of AHU-B and AHU-C at 292-F. This will include disposal of old Air Handling Units.…
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
General Powder/Solid Material Combination Studies to evaluate various combinations of powder/solid material for fabrication into a durable form.…
Welding repairs on Steam Lines.…