This study aims to evaluate the mercury (Hg) and hydrogen gettering and retention abilities of metal catalyzed inorganic substrates, in support of …
This activity will investigate the effects of various processing conditions (heat, hydrogen, air) on vacuum oils.…
Install flow measurement equipment in the existing twin culverts under E Road at the F-08 Outfall.…
Install a new Uninterruptible Power Supply (UPS) system that will replace the existing 50 kVA UPS in Building 702-A, Room 113…
Due to a high demand of portable power in H-Tank Farm, 11 Diesel Generators, 2 Diesel Compressors, and 1 Diesel Light Tower have recently been proc…
Sphincter seal assemblies have been proposed for introducing blend cans and shield cans into gloveboxes for use in the downblending process of surp…
A decision was made to permanently cease operation of the TRS.…
Replace Uninterruptible Power Supply (UPS), which will consist of the installation of two (2) new UPS systems, in Building 703-44A.…
Inspection and Treatment of Utility Poles requiring soil disturbance within the F, N, and General Areas…
Pressure wash and repaint safety striping around 784-7A Steam Plant.…