Operations or STR will access and repair the line and decontaminate sewage as necessary.…
The objective of this task is to observe the effects of hydrogen charging at various temperatures.…
Prepare H-Canyon Outside Facilities samples for metal impurities analysis ...…
Replace the ultra-violet disinfectant system at the effluent of the Central Sanitary Waste Treatment Facility (607-74G).…
Construction of an approximately 65,000 square foot facility consisting of wet chemistry and various mechanical laboratories and including a highba…
Subcontractors will repair the roof on Building (Trailer) 221-24H…
The acetylene service is being air gapped and capped out in 773-2A in order to comply with new calculations for flammability and explosives ...…
Prepare and measure rheology of H canyon samples.…
This activity scope includes the installation, operation and maintenance of a Thermotron DSX-6650 vibration system.…
K-Area public address system in 704-K (War Room) and 701-2K (Command Area) will be upgraded.…