704-N Remove wall between rooms 12A and 12B.…
This EEC covers various routine maintenance activities that occur in the buildings within the MOX Complex Area.…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
The adsorption of different gases (hydrogen, oxygen, neon, argon, krypton, xenon) on metal particles (silver, gold, copper, palladium, platinum) an…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
702-A Water Intrusion Recovery.…
Proposed modificaton installs electrical componets for Saltstone Screw Feeder System upgrade.…
Project Management and Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
The proposed activity involves repositioning of copper service lines in 773-A C-143/147 (RBA).…