The recloser on A01 feeder is reaching end of it's life cycle and should be replaced.…
Construction of Prefabricated metal building, potable water line, and septic/drain field, and installation of two evaporators.…
This research is being funded through a PDRD to support the Tritium facility. The gas permeation, absorption, and adsorption of metal, ceramic, sem…
Sodium and lithium are present in most environmental samples. In seawater and some fresh water samples, the sodium concentration can cause interfer…
Subcontractor will provide roof repairs at Building 225-5H. The Subcontractor will not disturb the existing roof while performing these repairs on …
Install a Wacker Neuson Model G70 (Serial # 24365945) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR50559) at Tank 27F RBA.…
Replace the packing in Return Pump #2 at 281-2H.…
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
Replace missing tile in the Crane Maintenance Stairwell airlock.…
Perform repairs to the interior of Building 722-A.…