The purpose of the design change is to replace the steel drain pipes with PVC where the steel lines exit the concrete of the building.…
Office of NEPA Policy and Compliance
May 3, 2021The purpose of the design change is to replace the steel drain pipes with PVC where the steel lines exit the concrete of the building.