Batch contact testing will be performed to examine the removal of cesium from Tank 9H salt solution using crystalline silicotitanate (CST).…
Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
This EEC is part of the F and H Laboratory (FHL), 773-A Laboratory Modification Project. This activity covers the preparation of radioactive standa…
This activity will encompass two (2) analytical methods that will be performed in 773-A, B-111: Interfacial Tension (IFT) and Oil and Grease Analys…
The proposed action is to remove and replace existing roofing systems on Building 221-F Truckwell.…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in R…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Repair SW Valve No. 10 at 681-3G.…
EEC covers the Real Estate Lease, siting, construction, utility installation and operation of the Verizon-SRS ll Cell Tower and appurtenances adjac…