Award Number: DE-EE0008962, CX(s) Applied: A9, B3.6, B5.15, Wind Energy Technologies Office, Location(s): SC, Office(s): Golden Field Office
The DCF installs a rupture disk assembly on the HBMS attached to each spent hydride bed stored in HANM and TEF.…
Replace ramp and deck on andi-houses 705-9H and 705-55H.…
Removal of Temporary Constructed Door and Wall Openings in 226-F…
This activity will investigate the properties and degredation behavior of bulk and particulate polymers. The degradation will be induced using ligh…
Incorporation of a laser into the mixing extruder of a FDM 3D printer for additive manufactured parts.…
SRNL will dissolve stainless steel clad nuclear fuel using electrolytic dissolution.…
This activity will replace the existing 152-K transformer with a pole mounted transformer, and leave the 152-K transformer abandoned in place.…
Two rain shelters previously used as car-pool drop-off sheds (54-19G and 54-22G) are being re-purposed as designated smoking shelters and relocated…
Activity will install new steam line support poles to replace defective steam line support poles H-47 and H-48.…