Activities to support Tank Farm and DWPF with qualification of Sludge Batch 10.…
Remove existing guardrails and ladder on 234-H. Install an aluminum ladder that meets OSHA and NFPA 101 requirements.…
Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Subcontractor will provide roof repairs at Building 703-10B.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…
Generate trace level dimethylmercury gas standards using a permeation tube and a Kintec calibration gas generator system.…
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …
Remove receptacles and non-load-bearing wall, repaint walls, and replace carpet and baseboards in Building 773-63A, Rooms 10 and 11.…