The University of New Mexico proposes to develop and demonstrate scalable advanced bearings and seals of fluoride salt pumps for Fluoride-salt-cool…
Chiller and HVAC units require periodic coil cleaning, the majority of these PM are yearly.…
This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitors parts in the TritiumExtraction Fac…
Abandonment of General Separation Area Eastern Groundwater monitoring wells HAA-12A, HAA-13A and HAA-15A.…
Magnetic nanoparticles will be prepared and mixed with heavy crude oil to form a paste for induction heating and viscosity reduction.…
Vendor will pressure wash screens for Deepwell 905-108H.…
Install carpet and paint room A129 in 772-F.…
Install hands free water dispensers in 704-C, 703-43A, and 704-N.…
Six, 6, new hard wall offices will be constructed on the 2nd floor of Building 730-B.…
Remove and replace floor tiles in select portions of the Purification Area within the K-Reactor, and prep and paint select wall locations.…