Subcontractor will provide roof repairs at 249-H.…
Subcontractor will provide roof repairs at 705-H.…
Piping will need to be removed and worked to fit the new filter. Some piping components will be replaced.…
Seven (7) data lines will be installed in room 422 of 105-L.…
Apply roof coatings and seal roof leaks.…
Temporary Modifications (Temp Mod) 264H-TMC-19-270 and 264H-TMC-19-271 utilize tubing, regulator, PSV, and associated fittings to provide a bypass …
The PA is to remove a thermally actuated valve that is currently integrated into the fire suppression system (FSS).…
722-N, Remove carpet/tile and cove base due to water intrusion.…
The attached Scope of Work provides details for the replacement of PIV 2070, which will be replaced with PIV 2230.…
A portable building will be installed in 737-A SREL Complex for research purposes.…