This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket materials.…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is required.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is not required.…
Subcontractor will provide roof replacement at Building 701-2L.…
Pump Corrshield MD4100 into Chilled Water Loop at 789-2B.…
SRSCRO will dismantle and remove D Area Metal Buildings including 484-15D D-Area Storage Building, 683-D Chlorine Building, ...…
Subcontractor will provide roof repairs at 773-63A. The Subcontractor “will not” disturb the existing roof while performing these repairs on 773-63…
A new metal-organic framework (MOF) will be tested for removing pertechnetate from a sample of SRS high level waste…
Replace floor tile in building 713-1N, Section A1, Corridor 2 hallway between offices N321 and N204.…