736-A Evaluate/correct missing jacketing on water supply line.…
MOX-Material Disposition personnel are working to remove these items from storage either by selling, sending to SRSCO, or dispositioning as scrap m…
This modification will upgrade the detection system, install duct smoke detection, install pull stations, provide HVAC emergency shutdown, and upgr…
Provide seismically qualified SC Fire Barrier between 233-H and 233-1H in room 40, 41, and 42.…
701-8G Excavate the top of the septic tank.…
Replace No. 002 Cooling Water Return Pump/Motor located at 281-2H…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3500 to replace GB recirculation blower motors with new 15 hp motor design and re…
Kitchenette enhancements to be done in 704-K Room 14.…
Reroute condensation drainpipe from Air Handling Unit (AHU) catch pan on the second level of 713-1N (northwest corner).…
The Stratasys Rapid Prototyping Machine was purchased to support research and development. …