Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
A supplemental purge ventilation system is required to support the Pulse Tube Agitator (PTA) operation in FPP-1 during future transfers. Higher ve…
Remove from SRS Trailer 703-18B, Executive Mobile Portalet 724-42E (located in B Area), and 3 transformers. Relocate Trailer 703-18B to Z-Area. De…
Testing the use of electrolytic dissolver to dissolve a variety of materials (e.g. stainless steel).…
Uranium will be separated from radioactive sample matrices by use of UTEVA resin. Liquid residue will be created from the additional radioactive ma…
Install additional receptacles and paint in Room 135 of Building 730-2B.…
Steam line insulation removal to identify and fixed leak upstream of Valve PSS-V-7703.…
Remove and replace the defective seal on the #5 Cone Valve at the 681-3G Pump House. Seal is suspect asbestos.…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in R…
Prep and paint pump skid at Waste Solidification Building (WSB).…