Reroute condensation drainpipe from Air Handling Unit (AHU) catch pan on the second level of 713-1N (northwest corner).…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
This EEC covers various routine maintenance activities that occur in the buildings within the MOX Complex Area.…
The adsorption of different gases (hydrogen, oxygen, neon, argon, krypton, xenon) on metal particles (silver, gold, copper, palladium, platinum) an…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Proposed modificaton installs electrical componets for Saltstone Screw Feeder System upgrade.…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
Project Management and Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
This EEC is for the design to update valve actuator and limit switch for H-233000-DET-HV-1267331 (aka DS-118) per M-DCF-H-13811.…
Install an open steel shed to park/protect government equipment.…