The damaged portion(s) of the DW line needs to be located, repaired and/or replaced.…
Chiller systems used to regulate the temperature of R and D instrumentation and devices require a coolant for proper operation.…
This EEC covers various general renovations for buildings 725-N. 725-1N, and 725-2N in Central Shops.…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Remove and replace 922 Condensate Tank Pump A in -20 of 105-L.…
Subcontractor will provide roof repairs at 248-H.…
Site construction will prep and paint the exterior of the 735-B Stack and the associated fiberglass exhaust duct.…
Re-coating and re-lining of 2-inch and 4-inch sewer lines beneath Building 235-H.…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work orders.…
Abandoned fuel oil heater at 725-2N will be removed and disposed of at the scrap and salvage yard.…