Install additional receptacles in Building 736-A, Room 131.…
Repair and Replace Packing of 1 Steam Valve Outside of K-Area Purification and 2 Steam Valve Inside of Purification…
Make repairs to floor of 704-37E and 704-29E.…
Install hands free water dispensers in 704-C, 703-43A, 704-N, and 703-46A.…
The subcontractor shall replace wooden line switch ties from the railroad bed, identified by site transportation and engineering as part of the 202…
SRNL Research and Development Engineering will be conducting a fire suppression test in 723-A to support the Surplus Pu Disposition Project in K-Ar…
Venting or direct-shipment and disposal of specialty gas cylinders, nitrogen, carbon dioxide, compressed air, in A Area.…
Perform structural repairs on 772-F and 772-1F per the structural integrity program, SIP, inspection report T-CLC-F-00557.…
This proposed activity will install a spill containment box and vapor stimulator tubes at 254-5H Fuel Oil Underground Storage Tanks, FOUSTs, to all…
Install Universal Wiring, UW, drops in Building 730-2B.…