The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Repair SW Valve No. 10 at 681-3G.…
EEC covers the Real Estate Lease, siting, construction, utility installation and operation of the Verizon-SRS ll Cell Tower and appurtenances adjac…
At the Aviation Operations Department, a fuel drip has developed. An absorbent pig is located within the fuel pit and is absorbing the drip. The dr…
Two plastic 3D printers will be operated inside 723-15A.…
Renovate Lab C-130 in Building 773-A to provide a modern laboratory space with a large radiohood located in the center of the room.…
This EEC covers the installation and operation of an autoclave, Model SSR-3A-ADVPB in Building 607-17A.…
This activity is to prepare and relocate various equipment from the MCA to off-site and on-site recipients.…
Relocate chiller to new location, inside Temporary Construction Opening (TCO) across from B209 inside Building 226-F.…