High winds from a recent storm damaged a covered deck between buildings 22 and 23 within the MOX Complex Area.…
This EEC covers the removal of 3 inlet HEPA Filters and the respective housings that were used to support Cabinet 26 operations in F091.…
Establish a field location and install a 10-year field experiment to simulate and study the movement of radiounuclides through an artificial vadose…
Modify the driving path of the Shielded Canister Transporter, SCT, to and from both S-Area Glass Waste Storage Buildings, GWSBs, 250-S and251-S, to…
A commercial vacuum induction furnace, Centorr System VII, will be used to make metallic samples using molds.…
The subcontractor, Queen City Railroad Construction, shall replace wooden line switch ties from the railroad bed, identified by site transportation…
The Fischer-Tropsch Synthesis, gaseous-phase reaction, will be performed in stainless steel vessels and reaction products analyzed by gas chromatog…
Tritium Extraction Facility, TEF, Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Empty Shipping Containers require annual maintenance and testing to ensure the container meets all SARP requirements.…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory, Building 999-1W…