Categorical Exclusion Determinations: Savannah River Operations Office

Vegetative Response to Metal Exposure in a Growing MediaCX(s) Applied: B3.6Date: 03/22/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Pretreatment Engineering Platform (PEP) Sludge Simulant PreparationCX(s) Applied: B3.6Date: 03/17/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
M-Area Chemical Oxidation Phase II: Shallow Water Table Direct Push Technology Borings and Monitoring Well InstallationCX(s) Applied: B3.6Date: 03/16/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
M-Area Chemical Oxidation Phase II: Shallow Water Table Direct Push Technology Borings and Monitoring Well InstallationCX(s) Applied: B3.6Date: 03/16/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations O...
Provide Power and Uninterruptible Power Supply System in 241-062FCX(s) Applied: B2.2Date: 03/10/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Fire Department Flow Test of N-Area HydrantsCX(s) Applied: B1.3Date: 03/09/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
735-A, D-wing, Main Floor ? ARGUS Halon Suppression System ReplacementCX(s) Applied: B2.5Date: 03/09/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office