CX-011819: Categorical Exclusion Determination

685-G PAR Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections CX(s) Applied: B1.3 Date: 01/27/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

January 27, 2014
Estimated Read Time   min
685-G PAR Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections
CX(s) Applied: B1.3
Date: 01/27/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office

The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-Lake), in part to facilitate Federal Energy Regulatory Commission inspection requirements.