CX-012067: Categorical Exclusion Determination

Installation of New 208 Voltage Alternating Current Electrical Service for 707-C CX(s) Applied: B1.3 Date: 03/05/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

March 5, 2014
Estimated Read Time   min
Installation of New 208 Voltage Alternating Current Electrical Service for 707-C
CX(s) Applied: B1.3
Date: 03/05/2014
Location(s): South Carolina
Offices(s): Savannah River Operations Office

This project will install a 3-phase 208 voltage alternating current new service to supply a secondary/redundant uninterruptible power supply system for the Electrical Room of 707-C, along with a distribution panel configured to support four future circuit panels to be installed in room 117.