Repair Text Duct Leak/Drill Hole for CameraCX(s) Applied: B1.3Date: 08/19/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Bench Scale Process Development - In-Line Mixing StudyCX(s) Applied: B3.6Date: 08/10/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Analysis of Evaporator Scale SampleCX(s) Applied: B3.6Date: 08/10/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Asbestos Removal in Spent Fuel Project (SFP) FacilitiesCX(s) Applied: B1.16Date: 08/10/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Installation of 607-47H Lift StationCX(s) Applied: B1.3Date: 08/10/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Modular Caustic Side Solvent Extraction (MCU) Improved Solvent TestingCX(s) Applied: B3.6Date: 08/09/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Install Platform and Stairs at F-10 OutfallCX(s) Applied: B2.3Date: 08/09/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
D-Area Chemical Truck Unloading StationCX(s) Applied: B2.5Date: 08/04/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
484-D Sump Discharge Line InstallationCX(s) Applied: B1.3Date: 08/04/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Howard T. Ricketts Laboratory (HTRL) Lab 134CX(s) Applied: B3.6Date: 07/30/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office