221-F Canyon Truckwell Heating, Ventilation, and Air Conditioning SystemCX(s) Applied: B1.5Date: 07/29/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Pole Inspections For C- Area - By Sub-Contractor (L)CX(s) Applied: B1.3Date: 07/26/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Operation of Tube Furnace for Synthesis of Hydrogen Storage MaterialsCX(s) Applied: B3.6Date: 07/22/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Design, Procure, and Install a Dewatering Transfer Pump in Waste Tank 4, Riser 6, for Heel RemovalCX(s) Applied: B1.3Date: 07/22/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Well Installation at T-AreaCX(s) Applied: B3.1Date: 07/21/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Relocate Hydroburst System from 238-H to 234-7HCX(s) Applied: B1.31Date: 07/20/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Install Seventeen Monitoring Wells Around 715-DCX(s) Applied: B3.1Date: 07/18/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Disable F-Tank Farm (FTF) Air Compressor SequencerCX(s) Applied: B1.3Date: 07/18/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
E Area Fire Water ExtensionCX(s) Applied: B1.15Date: 07/18/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-ACX(s) Applied: B2.1Date: 07/13/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office